top of page

NEWS FEED

4/17/2019

CPEP is complete and ready for Final Review

4/11/2019

Final Presentation

4/1/2019

Final Report

3/28/2019

Status Report

3/27/2019

Slide Outline

3/21/2019

Status Report

3/14/2019

Status Report

2/28/2019

Status Report

2/14/2019

Status Report

2/7/2019

Status Report

1/31/2019

Status Report

1/24/2019

Status Report

1/17/2019

Status Report

12/7/2018

Resume

11/28/18

Com Log 3 

11/14/18

Notebook Submission C

11/7/18

Com Log 2 

10/23/18

Abstract

10/22/18

Notebook Submission B Presentation

10/19/18

Notebook Submission B

10/17/18

Building Statistics Part 2

09/26/18

Com Log 1

09/26/18

Abstract

09/14/18

Bio Sketch and Peer Review

09/12/18

Structural Existing Conditions

10/1/18

Notebook Submission A

09/10/18

Personal Note and AE Note Thank You

09/10/18

CPEP Full Menu Functionality

09/04/18

CPEP Draft Due Active Online

08/31/18

Building Statistics Part 1

08/28/18

Pick a Company for AE Career Fair

08/27/18

Attended Breakout and CPEP Seminar

08/27/18

Confirmed Master List Information

08/27/18

Project Initiation Checklist II

08/20/18

Project Initiation Checklist I

05/14/18

Obtained Documents

05/14/18

Owner Permission Received

Bullet Journal

CPCP is Complete and Ready for Review

4/17/2019

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Lauren Lesniakowski. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page